The Link-Belt 85RT is a telescopic-boom rough-terrain crane for construction and industrial lifting applications. Plan the lift around the load, the proposed operating position, and the configuration available for the project.
Typical work includes placing materials, erecting components, and positioning equipment during installation or maintenance. Access to the pickup and placement areas matters as much as the space where the crane will stand.
Review approach routes, turning restrictions, overhead lines or structures, nearby operations, and ground conditions. Confirm the outrigger arrangement and ground support required for the supplied machine. Do not assume that every outrigger position or boom-and-jib arrangement permits the same load; use the applicable chart and account for required deductions.
Send Stevenson Crane the load weight and dimensions, required height and working radius, site address, and proposed schedule. Include a site plan or photographs where helpful. Ask the team to confirm available components, transportation considerations, and equipment availability before selecting the crane.